Architect – Larry Graves

Uncategorized
Architect – Larry Graves

Larry Graves, Architect and Alliance Design Group Principal, has been practicing architecture for more than 25 years.  He recently designed a 5,000 S.F, “Green House” constructed with bales of hay featured on PBS and was recognized in a number of magazines. “The challenge of selecting building materials to achieve the highest “green” rating has been very rewarding.”

Alliance Design Group
811 Gardner Ave.
Ventura, CA 93004

805-659-4017
ldgraves22@hotmail.com